CAMBRIDGE QT Installationsanleitung Seite 36

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 40
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 35
page 36
Selecting “Error” for the screen above pops open a window that
details the error in the system. The format of the error string is the
same as shown on the front panel. The screen below shows there
are emitter faults in 3 zones and the administrator should look for
nonfunctional emitters.
Click OK to close the window.
Click the acknowledge link and the status goes back to OK. If the
error persists, the status will show the error. This can be used to test
problem resolutions.
Post Installation Handoff
Perform a nal walkthrough to satisfy all aspects of the system
performance:
1. Fill out the settings record.
2. Store guide with completed settings record in the clear plastic
job ticket holder next to the control module. If there is a hard
module failure, the recorded values can be used to recongure
the system. System settings are retained after a power outage.
3. Lock the control module panel by moving the “lock” switch to
the Locked position.
4. Lift the control module front panel and hinge it backward into its
closed position. Tighten all retaining screws.
5. If operating by software control, show the administrator how to
connect to the control module using both the Hostname and IP
Address methods. Share this guide with the administrator.
Seitenansicht 35
1 2 ... 31 32 33 34 35 36 37 38 39 40

Kommentare zu diesen Handbüchern

Keine Kommentare